Ukraine 110 kVA Generator Project
A 110 kVA Berksan generator with a Baudouin engine and a sound-insulated canopy was built for Ukraine; prepared together with its automatic transfer switch panel, the unit set off by truck.
Solution implemented on site
For this set bound for Ukraine, the generator and the changeover system were prepared together. The 110 kVA unit uses a Baudouin diesel engine, with the engine and alternator housed in a sound-insulated Berksan canopy that keeps running noise down. The automatic transfer switch (ATS) panel that will manage the changeover between the grid and the generator was part of the same shipment, so the buyer can connect the generator to the electrical installation without sourcing a separate transfer panel on site.
At the factory, the generator was run together with its transfer panel: with a mains failure simulated, the team checked that the engine started on its own and took over the load, and that the supply went back to the grid when power returned. The canopy was then covered in stretch film, with blue protective profiles on its corners. Brought out of the warehouse by forklift, the unit was loaded into a box truck and secured with ratchet straps.
Having passed its factory tests, the set left in 2026 for delivery to the buyer in Ukraine. Because the transfer panel was tested together with the generator, only the power and control connections remain to be made on site. Once they are in place, the 110 kVA Berksan generator with its Baudouin engine will take over the site's load on its own whenever the grid fails.
Let's design the right power solution for your project together.