/ Municipality

Bolu Devlet Su İşleri Generator Project

A 12 kVA Berksan BDG13 ES3 Super Silent standby generator was supplied and commissioned for the Bolu Devlet Su İşleri (State Hydraulic Works) facility in Bolu.

Bolu, Türkiye2026Bolu Devlet Su İşleriYurt İçi
Power
12 kVA
Generator Brand
Berksan
Model
BDG13 ES3
Current Type
Acil Güç
Year
2026
Category
Municipality
Project Details
1 / 2
Büyüt

Solution implemented on site

To keep the water infrastructure and pumping operations of Bolu Devlet Su İşleri (State Hydraulic Works) running during power outages, a standby power solution suited to the facility's needs was provided. A 12 kVA Berksan BDG13 ES3 “Super Silent” generator, notable for its compact size and low noise level, was determined to be the most suitable option.

Thanks to its wheeled, sound-insulated canopy design, the generator can be positioned easily and was placed in a suitable area within the facility; the electrical connections and the supply points on the control-panel outlets were prepared. The fuel system and control panel were checked prior to commissioning.

After installation, the generator was started and tested under load, and its operating performance was verified. As a result, Bolu Devlet Su İşleri gained a reliable standby power source able to supply its critical equipment without interruption during any grid outage.

A thank-you

Thank you, Bolu Devlet Su İşleri, for choosing us.

As Berksan Generator, with our right-product, on-time-delivery and 24/7 technical support approach, we will continue to be worthy of your trust.

You're Next

Let's design the right power solution for your project together.

+90 532 606 94 60
WhatsApp Contact