/ Food Production

Arslan Ekmek Fırını Lapseki Generator Project

A 55 kVA Berksan generator with a Yangdong engine and a sound-insulated canopy was prepared for Arslan Ekmek Fırını in Lapseki, Çanakkale; carried by tow truck, the unit was installed at the bakery and commissioned.

Çanakkale, Turkey2026Arslan Ekmek FırınıDomestic
Power
55 kVA
Generator Brand
Berksan
Model
Yangdong
Current Type
Backup Power
Year
2026
Category
Food Production
Project Details
Zoom

Solution implemented on site

At a bakery, production starts at night, and getting the morning bread onto the shelves on time depends on the dough machines, the oven and the proofing cabinet running without interruption. Arslan Ekmek Fırını in Lapseki, a district of Çanakkale, did not want a power cut to waste a half-baked batch or dough waiting to go into the oven. Adding up the power drawn by the dough mixers, the oven's control circuits, the lighting and the refrigerated cabinets showed that a 55 kVA generator would cover the load. A Berksan unit of that rating was prepared with a Yangdong diesel engine and a sound-insulated canopy.

When choosing the location, care was taken to keep the exhaust directed away from the production area and the surrounding buildings; the generator was placed close to the bakery, and the cable route was planned to reach the main switchboard by the shortest path. Wrapped in stretch film at the factory, the generator was strapped onto the platform of a tow truck and carried to Lapseki. After the unit was set on its prepared base, its power cables were connected to the main switchboard and an automatic transfer switch (ATS) panel was put into service to switch the bakery between mains and generator power.

Before the generator was started for the first time, the engine oil, fuel and coolant were topped up and the battery charge was checked. After running at idle, the generator was tested under load with the mixers and the oven working, while the control panel confirmed that voltage and frequency held steady. Finally, the mains supply was cut to confirm that the ATS shifted the load onto the generator and put it back on the grid once power came back. With the 55 kVA Berksan generator commissioned in 2026, Arslan Ekmek Fırını can take its bread out of the oven on time in Lapseki, even when the power goes out.

A thank-you

Thank you, Arslan Ekmek Fırını, for choosing us.

As Berksan Generator, with our right-product, on-time-delivery and 24/7 technical support approach, we will continue to be worthy of your trust.

You're Next

Let's design the right power solution for your project together.

+90 532 606 94 60
WhatsApp Contact